Dear colleagues, we would like to inform you that we resume normal operations and will work remotely.
Please note that you can contact us at: +38 (098) 010 10 10. Glory to Ukraine!

The project (the approving part of the WP)

The composition of the project (the approval part of the WP) for the construction of objects

D.1. Explanatory note

  1. Initial data for design.
  2. Brief description of the object, data on the design capacity of the object (capacity, throughput).
  3. Engineering research data.
  4. Information on fuel, water, electrical and thermal energy needs, energy saving measures, etc.
  5. Information on the sequence of construction and launch complexes.
  6. EIA materials, including data on all expected impacts on the environment (land, water and other resources), their minimization and compensation.
  7. Solutions for engineering protection of territories and objects.
  8. Accessibility of the object's territory for people with reduced mobility.
  9. Section of engineering and technical measures of civil protection (civil defense).
  10. Reliability and Security Section.
  11. Main technical and economic indicators.
  12. Economic calculation of investment efficiency.
  13. Section on scientific and technical support (if necessary).
  14. Information with scope of works.
  15. Calculation of the class of consequences (responsibility) and the category of complexity in accordance with DSTU-NB B.1.2-16.

D.2. Architectural and construction solutions

  • Decisions and main indicators of the master plan, improvement and greening. Brief description and justification of architectural solutions and their compliance with the functional purpose, taking into account urban planning requirements. Solutions for exterior and interior decoration.
  • The main decisions from the adopted structural scheme (materials of walls, floors, roofs), justification of the applied types of foundations and other structures, their categories of responsibility, thermal efficiency of enclosing structures and thermophysical characteristics, adopted architectural and engineering decisions regarding the protection of premises from external and internal noise (hum) .

D.3. Technological part. Technological solutions of the construction object. DBN A.2.2-3-2014 21

D.4. Engineering equipment solutions

  • Basic solutions for internal and external engineering equipment - heating, ventilation, air conditioning, gas supply, water supply and sewage, electrical equipment, electrical lighting, lightning protection, communication, fire and security alarm, alarm, radiofication, television, automation of sanitary and technical devices , dispatching, equipment with intercom devices (for residential buildings), energy saving requirements.
  • Measures for protection against stray currents and anti-corrosion protection.
  • Engineering solutions for fire prevention measures.

Note. The explanatory note should be as concise as possible.

Basic drawings

  1. A site plan in one of the following scales: 1:2,000, 1:5,000 or 1:10,000.
  2. A topographical master plan at a scale of 1:500 or 1:1,000.
  3. Basic solutions for vertical planning, improvement and landscaping.
  4. Scheme of transport and pedestrian connections (if necessary).
  5. Plan of routes of external engineering networks and communications on a scale of 1:2,000.
  6. 1:500 scale plans of routes of intra-site networks and related structures.
  7. Schemes of the location of foundations, floor plans, facades, sections of buildings and structures with a schematic representation of the main supporting and
    enclosing structures in one of these scales 1:50, 1:100 or 1:200; main nodes of conjugation of structural elements, reinforcement schemes of monolithic reinforced
    concrete structures, details of fencing structures on a scale of 1:25.
  8. Interiors of the main premises (developed additionally according to the design task).
  9. Catalog sheets when using projects (project solutions) of repeated application.
  10. Floor plans, facades and sections when using projects (design solutions) of reuse.
  11. Schematic diagrams of the arrangement of engineering equipment (heating, ventilation, cold and hot water supply, sewage, drains, electrical equipment, gas and
    cold supply, air conditioning, communication DBN A.2.2-3-2014 22 and signaling, automation of engineering equipment, dust and smoke removal, garbage removal),
    principled decisions regarding the implementation of energy saving measures.
  12. Technological layouts with plans for the placement (location) of the main equipment.
  13. Initial data for the development of design documentation for custom-made equipment.

D.5. Organization of construction

The composition, scope and content of the design documentation of the section are established in accordance with the requirements and recommendations of the DBN A.3.1-5.

D.6. Estimated documentation

The composition, scope and content of the estimate documentation is determined in accordance with DSTU B D.1.1-1.

Consultation on the development of a construction project is Free!

Order a consultation

The main services of the architectural office "One Project":

«One Project» - development of construction projects

A full range of services for the design and support of objects

© Copyright, "One Project" LLC. The use of site materials is only subject to a hyperlink to the oneproject.com.ua site